During this week, we returned to school and uploaded all the footage we filmed during the holidays. The footage we shot came out very clear and my partner and I are very pleased with the outcome. We have edited the footage we have gathered so far, and it looks exactly how we visualised it to be. However, there are parts where we need to use cuts and close ups to hide the continuity errors that we have made.The continuity will also be a problem throughout the music video as the weather and the lighting outside is changing as it is getting darker quicker therefore we have less time to record in the daytime which means it will naturally look darker when we are recording. Another problem that we have when recording is the timing as our actors cannot film at certain times therefore our filming schedule doesn't work at this time.
Also, during our free time my partner and I learnt how to use the green screen, whilst we don't have much to be doing at this point in the project. We will possibly use the green screen for our photoshoot of the Artist for the Magazine Advert.
Wednesday, 13 November 2013
Monday, 11 November 2013
Shooting Script
This is the shooting script we have written up for our music video. We have colour coded the all the shots within the same locations so it is easier for us to identify all the shots that need to go together and filmed within the same day to avoid breaking the continuity.
Thursday, 7 November 2013
Blog Reflection 8
During this Half Term week, my partner and I met up and added more detail to the script and made changes to the final treatment based on the changes we made to our idea.
Also, during the week, we got in contact with our actors and shot some footage.
We filmed the first 10 shots of the script in the bedroom and outside on the street. We also took a little extra footage in case the shots don't look as accurate once its been uploaded to the Mac.The only problem with filming during the holiday was the actors weren't available at the same time so, finding a balance and the right day to film was difficult. I also used these holidays to finish adding the text on the flat plan for the Magazine Advert and DigiPak, after my partner completed the images on these. Next week, we will film more footage once back at school and start editing the footage we have shot during the holidays.
Also, during the week, we got in contact with our actors and shot some footage.
We filmed the first 10 shots of the script in the bedroom and outside on the street. We also took a little extra footage in case the shots don't look as accurate once its been uploaded to the Mac.The only problem with filming during the holiday was the actors weren't available at the same time so, finding a balance and the right day to film was difficult. I also used these holidays to finish adding the text on the flat plan for the Magazine Advert and DigiPak, after my partner completed the images on these. Next week, we will film more footage once back at school and start editing the footage we have shot during the holidays.
Subscribe to:
Posts (Atom)
